Projects

M&M Demolition carry out demolition and enabling works across all sectors, undertaking projects throughout the UK from private individuals to large multinational companies. Below, is a snap-shot of some of our recently completed projects to demonstrate the scope and versatility of our work. Should you require a client reference testifying the quality of our works, please do not hesitate to contact us.

Pilgrim Springs, Folkestone, Kent

M&M Demolition were contacted by Cablesheer to carry out the demolition and associated works at Pilgrim Springs, Folkestone. The site was once arranged of 5 blocks of 4 storey residential flats, the site is being cleared for future regeneration.

SCOPE OF WORKS

  • Site Set Up
  • Internal Strip Out of Blocks 1-5
  • Demolition of Blocks 1-5
  • Removal of Slabs and Foundations
  • Crushing of Hardcore & Concrete for re-use on site as Piling Mat
  • Traffic Management Plan.

CHALLENGES

  • High Profile Residential Location
  • Close proximity to Public Footpath & Highway
  • Layout and Gradient of the Site
  • Restricted Vehicle Movements through Residential Housing Estate.

HOW WE MADE A DIFFERENCE

  • Pre-Commencement Meetings with the Client, Client Representatives and Local authority to obtain licenses and plan works
  • Full time Residents Liaison Officer on Site
  • Erection of Designed Demolition Protection Scaffolding with Monoflex
  • Installation of Dust Suppression System
  • Installation of Vehicular Wheel Wash
  • Pre-planned/Booked Vehicle Movements
  • Recycling of Hardcore and Concrete to be re-used on site as Piling Mat.
  • Post Demolition Clean of the Surrounding Roads
  • Video and Photo Records of Works Completed
  • Project Completed Safely, on Time and on Budget.

Client: Cablesheer
Sector: Residential
Location: Folkestone, Kent
Demo Period: 14 weeks
Commenced: October, 2018
Completed: February, 2019

Bannister Road, Southampton

M&M Demolition have been contracted by Lidl to carry out the demolition and associated works at Bannister Road, Southampton. The site is being cleared to for construction of a new Supermarket.

SCOPE OF WORKS

  • Site Set Up
  • Internal Strip Out of Former Land Rover Garage
  • Demolition of Former Jaguar Showroom
  • Demolition of Former Work Shop
  • Removal of Street Furniture
  • Removal of Slabs and Foundations
  • Removal of Hardstanding
  • Crushing of Hardcore & Concrete for re-use on site as Piling Mat
  • Traffic Management Plan
  • Topographical Survey

CHALLENGES

  • High Profile Commercial and Residential Location
  • Close proximity to Public Footpath & Highway
  • Restricted Vehicle Movements through Peak Hours.

HOW WE MADE A DIFFERENCE

  • Pre-Commencement Meetings with the Client, Client Representatives and Local authority to obtain licenses and plan works
  • Full time Residents Liaison Officer on Site
  • Installation of Dust Suppression System
  • Installation of Vehicular Wheel Wash
  • Pre-planned/Booked Vehicle Movements
  • Recycling of Hardcore and Concrete to be re-used on site as Piling Mat.
  • Post Demolition Clean of the Surrounding Roads
  • Photo Records of Works Completed
  • Project to be Completed Safely, on Time and on Budget.

Client: Lidl
Sector: Commercial
Location: Southampton
Demo Period: 6 weeks
Undertaken: January, 2020

Mayow Park Warehouse, Lewisham

M&M Demolition have been contracted by Lewisham Homes to carry out the Demolition and Associated Works at Mayow Park Warehouse, Lewisham. The site is being cleared to for construction of a Residential Dwellings.

SCOPE OF WORKS

  • Internal Strip Out of Former Warehouse
  • Erection of Tree Protection
  • Removal of Trees
  • Demolition of the Warehouse
  • Removal of Slabs and Foundations
  • Removal of Hardstanding
  • Removal of Demolition Arisings
  • Formation of Site Levels
  • Erection of Site Hoarding and Lights
  • Installation of Security Concrete Barriers
  • Traffic Management Plan
  • Site Set Up

CHALLENGES

  • Adjacent to Residential Properties
  • Adjacent to Mayow Park
  • Close proximity to Public Footpath & Highway
  • Restricted Vehicle Movements through Peak Hours.

HOW WE MADE A DIFFERENCE

  • Pre-Commencement Meetings with the Client, Client Representatives and Local authority to obtain licenses and plan works
  • Full time Residents Liaison Officer on Site
  • Installation of Dust Suppression System
  • Pre-planned/Booked Vehicle Movements
  • Post Demolition Clean of the Surrounding Roads
  • Photo Records of Works Completed
  • Project to be Completed Safely, on Time and on Budget.

Client: Lewisham Homes
Sector: Commercial
Location: Lewisham, London
Period: 4 weeks
Commenced: March, 2020

1-10 Huguenot Place, Heneage Street, London, E1 5LN

M&M Demolition were contracted by Curo Construction to carry out the Installation of Temporary Works and Demolition at Huguenot Place, London. The building was constructed in the 1940’s was operated as Commercial Units and is currently being redeveloped into residential units.

SCOPE OF WORKS

  • Internal Strip Out of Existing Building to be Demolished
  • Installation of Temporary Works
  • Demolition of Existing Building
  • Traffic Management Plan

CHALLENGES

  • High profile City Centre Location
  • Site occupied with various trades
  • Close proximity to neighbouring buildings
  • Confined site no compound for vehicles
  • Restricted vehicle movements

HOW WE MADE A DIFFERENCE

  • Pre commencement meetings with the Main Contractor to pre-plan the works
  • Logistics Team Pre Booked all Vehicle Movements
  • Appointment of an Experienced Temporary Works Supervisor
  • Full days site induction with tool box talks and daily briefings outlining safe system of works for working in live environments
  • Recycling 95% of demolition arising’s
  • Project completed safely, on time and to budget

M&M Demolition used their experience to manage the project professionally in order to complete the East block Demolition, revealing the complex temporary works system they installed to retain elements of the original structure. The RMD Slim shore propping system is fixed using resin-anchored Dywidag rods and plates, with concrete thrust blocks cast in the ground to ensure structural stability. The works were completed on time with no hidden extra costs.

Nick Brown

Commercial Manager, Curo Construction

Client: Curo Construction
Sector: Residential
Location: Huguenot Place, London
Demo Period: 6 weeks
Completion: January, 2019

The Old Boiler House, Angell Town Estate, Lambeth

M&M Demolition were contracted by Lambeth Council undertake the Complex enabling works project of the Old Boiler House, Angel Town

SCOPE OF WORKS

  • Site Set Up
  • Erection of Site Security Fencing & Entrance Gates
  • Licensed Asbestos Removal Works
  • Non Licensed Asbestos Removal Works
  • Erection of Demolition Protective Scaffolding
  • Internal Strip Out of Former Boiler House
  • Installation of Raking Shore Props to Basement Retaining Wall
  • Mechanical Demolition
  • Pepper Pot of Basement Slab to be retained
  • Importation of 6f2 material to basement
  • Formation of Site Levels
  • Waste Management Plan and Site Clearance
  • Erection of Boundary Security Fencing and Vehicular Gates
  • Traffic Management Plan & Project Management Plan

CHALLENGES

  • Site adjacent to Live Primary School as per the photo
  • Retention of retaining Boundary Wall as above
  • High Profile Residential Location

HOW WE MADE A DIFFERENCE

  • Pre commencement meetings with the Client and Local Authority to obtain permissions to commence the works
  • Daily communication with The Management of the Primary School
  • Logistic arranged all vehicle movements outside of School Drop Off Collection times and pre-arranged backloads to minimise vehicle movements
  • Full days site induction with tool box talks and daily briefings outlining safe system of works for working in live environments adjacent to Residential Properties
  • Recycling 95% of demolition arising’s
  • Project completed safely, on time and to budget

Client: Lambeth Council
Sector: Public
Location: Old Boiler House, Angell Town Estate
Demo Period: 10 weeks
Completion: October, 2018

Lunedale, Woodcock Drive, Wigan

M&M Demolition were contracted by Wigan Council to carry out the Site Set Up, Asbestos Removal and Demolition Works of the 23 x Residential Units.

SCOPE OF WORKS

  • Site Set Up
  • Erection of Site Security Fencing & Entrance Gates
  • Licensed Asbestos Removal Works
  • Non Licensed Asbestos Removal Works
  • Internal Strip Out of 23 x Residential Units
  • Mechanical Demolition of 23 x Residential Units & Various Outbuildings on Site
  • Waste Management Plan and Site Clearance
  • Importation of Top Soil
  • Formation of Site Levels
  • Seeding
  • Traffic Management Plan
  • Project Management Plan

CHALLENGES

  • High Profile Residential Location

HOW WE MADE A DIFFERENCE

HOW WE MADE A DIFFERENCE

  • Pre commencement meetings with the Client and Local Authority to obtain permissions to commence the works
  • Appointment of a designated Residents Liaison Officer
  • Issuing Newsletters to the Neighbours
  • Full days site induction with tool box talks and daily briefings outlining safe system of works for working in live environments adjacent to Residential Properties
  • Recycling 95% of demolition arising’s
  • Project completed safely, on time and to budget

Client: Wigan Council
Sector: Public
Location: Lunedale, Wigan
Demo Period: 11 weeks
Completion: July, 2018

Saxon Gate Development

M&M Demolition were contracted by Saxon Gate Development Ltd to carry out the enabling works at Saxon Gate, Back of the Walls, Southampton. The building was constructed in the 1990’s was operated as 18 Commercial Units and is currently being redeveloped into 41 residential units.

SCOPE OF WORKS

  • Site Set Up
  • Isolation of Services
  • Internal Strip Out of Existing Units in the Building undertaken in 2 Phases
  • Undertake the Role of Principle Contractor
  • Traffic Management Plan
  • Project Management Plan

CHALLENGES

  • High profile City Centre Location
  • Units within the building occupied whilst the site is ‘Live’
  • Close proximity to neighbouring new residential buildings
  • Confined site no compound for vehicles
  • Restricted vehicle movements

HOW WE MADE A DIFFERENCE

  • Pre commencement meetings with the local authority to obtain licenses for Parking Bay Suspension to allow for Recycling Containers to be sited
  • Appointment of a designated Residents Liaison Officer
  • Issuing regular Newsletter to the Neighbours
  • Installation of noise monitoring equipment
  • Full days site induction with tool box talks and daily briefings outlining safe system of works for working in live environments
  • Recycling 95% of demolition arising’s
  • Project completed safely, on time and to budget

Sector: Residential
Location: Saxon Gate, Southampton
Demo Period: 6 weeks
Completion: November, 2017

113-117 Gunnersbury Avenue

M&M Demolition were contracted by TKS Development Ltd to carry out the enabling works at 113-117 Gunnersbury Avenue, London. The building was operated as Topps Tiles Commercial Unit and is currently being redeveloped into residential units.

SCOPE OF WORKS

  • Site Set Up
  • Erection of Scaffold Protection System for Neighbouring Petrol Station
  • Internal Strip Out of the Unit
  • Installation of Temporary Works
  • Mechanical Demolition of Various Buildings at Rear of the Site
  • Site Waste Management Plan and Site Clearance
  • Traffic Management Plan
  • Project Management Plan

CHALLENGES

  • High profile Busy Main Road Location
  • ‘Live’ Petrol Station adjacent to the Site
  • Close proximity to neighbouring residential property
  • Restricted vehicle movements
  • Confined site limited compound for vehicles

HOW WE MADE A DIFFERENCE

  • Pre commencement meetings with the Client and Local Authority to obtain permissions to erect protective demolition scaffolding and agree Traffic Management Plan
  • Appointment of a designated Residents Liaison Officer
  • Issuing regular Newsletter to the Neighbours
  • Full days site induction with tool box talks and daily briefings outlining safe system of works for working in live environments adjacent to Petrol Station and Residential Property
  • Recycling 95% of demolition arising’s
  • Project completed safely, on time and to budget

Sector: Commercial
Location: Gunnersbury Avenue, London
Demo Period: 6 weeks
Completion: September, 2017

Specialists in High Reach Mechanical Demolition

The Highreach Demolition of two 18 storey tower blocks and associated buildings. This challenging eight month project was undertaken in a highly populated residential area with each tower block built on three live substations. The substations remained live during the demolition with substantial temporary works required to protect them and the network of HV cables below the existing site roads. Access to the substations was required 24/7 by the network provider. The project was completed on schedule.